Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Brian Scoles
|
|
|
final ok
|
Final | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | FAIL |
Brian Scoles
|
|
|
Please call technician Cody to meet you over there ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake- regualtors need shut off valve before reg and drip legs installed- garage needs regulator installed
|
Pressure Test | 9/16/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Brian Scoles
|
|
|
call Tech Cody when en route ###-#### Please and thank you :) Phone #: ###-#### Inspection requested via web by Nick Drake- 60lb gas pass whole system- tagged meter location- need to add all mech work going on to permit and pay fees and call in R/I inspection- do not cover until inspection completed
|
Pressure Test | 8/27/2019 | 8/28/2019 | 8/28/2019 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nick Drake-- 2# system needs tested on 100lb gauge at 60psi- need to added other mechanical to permit by R/I ie range, bath fans, any other mechanical being installed and pay fee
|
Issue PAID IN FULL permit | | | 8/27/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/27/2019 | | DONE |
|
|
|
This permit was created on the web by Nick Drake
|