Telephone call | | | 1/29/2020 | | DONE |
|
|
|
spoke with scott to verify their value on project. looks like whomever went in and added the final value on 12/31/19 did the actual value instead of just "adding" zero. final value turned in by GC is correct
|
First Notice | 11/4/2019 | 11/4/2019 | 12/31/2019 | | DONE |
Brian Scoles
|
|
|
This permit finaled on the web by Dan Flaherty
|
Final | 11/4/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Brian Scoles
|
|
|
Jake is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist- final ok
|
Final | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | FAIL |
Brian Scoles
|
|
|
Jake is the contact Phone #: ###-#### Inspection requested via web by stan lillquist- 1- need roof access fire riser room locked up 2- need to remove all ceiling tiles around register to finish R/I inspection on insulation duct and registers and have ladder onsite for inspection
|
Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Brian Scoles
|
|
|
Rough in for approval for cover for the bathroom hard lids. Jake is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- R/I ok- 2 exhaust duct in hard lids ok to cover- ok for grid- need to check flex connectors in curb at final on supply and R/A drops
|
Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Brian Scoles
|
|
|
Jake is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist- seal on exhaust, supply and R/A ok- ok to insulate- needs to see exhaust fans installed before cover- need to verify flex connectors at unit on supply and R/A per drawings
|
Issue PAID IN FULL permit | | | 8/28/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/28/2019 | | DONE |
|
|
|
This permit was created on the web by Kim Adams
|
Telephone call | | | 8/28/2019 | | DONE |
|
|
|
Per Kim with TML LLC the value should be 22,967
|