Final | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Brian Scoles
|
|
|
AC: 4141 Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok
|
Final | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | FAIL |
Brian Scoles
|
|
|
AC:4141 Phone #: ###-#### Inspection requested via web by Gary Reeves- condenser has been changed- still need other corrections made
|
Final | 11/27/2019 | 12/2/2019 | 12/2/2019 | P | FAIL |
Brian Scoles
|
|
|
AC: 4141 Phone #: ###-#### Inspection requested via web by Gary Reeves- need locking caps on a/c service ports- insulation on R/A and outside air needs to meet R-6 and must maintain 75% of actual value- condenser does not match man j has 3030 needs 3036- need to verify gas shut off valve for future unit heater has a plug in it its covered with painters paper could not verify
|
Rough-in | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - R/I ok
|
Pressure Test | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - 20lb gas pressure test ok - tagged meter location
|
Rough-in | 9/9/2019 | 9/10/2019 | 9/10/2019 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves 1- gas gauge at zero- 2- crawl needs completed- 3- line set has possible kink at ceiling in it and all rips and tears need fixed whole lineset and more supports 4- unit heater flue at roof need tar paper removed doesnt have clearance to combustibles
left notice front window
|
Pressure Test | 9/9/2019 | 9/10/2019 | 9/10/2019 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- gauge at zero
|
Issue PAID IN FULL permit | | | 8/30/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/30/2019 | | DONE |
|
|
|
This permit was created on the web by Gary Reeves
|