Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Brian Scoles
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- final ok
|
Pressure Test | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Brian Scoles
|
|
|
JUSTIN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 20lb gas pass x 2 from roof one for oven one for water heater- need to secure gas piping to roof supports by final
|
Pressure Test | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PART |
Brian Scoles
|
|
|
JUSTIN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pass on roof to existing x 2- need to see 20lb test on each line to water heater and over after regulator- drip legs on roof to long need shortened- need drip leg on gas line after shutoff valve in oven compartment- went over with installer onsite
|
Pressure Test | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PART |
Brian Scoles
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 2 x 20lb gas pass in walls only for pizza oven and water heater ok for cover- will test whole system at later time
|
Issue PAID IN FULL permit | | | 9/5/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/5/2019 | | DONE |
|
|
|
This permit was created on the web by BECCA DUMMER
|