Rough-in | 7/24/2020 | 7/27/2020 | 7/27/2020 | A | PASS |
Ben Livingston
|
|
|
Call prior to going Phone #: 2087940925 >> Inspection requested via mobile web by Travis Teichert
|
Rough-in | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | PART |
Brian Scoles
|
|
|
floor boots sealed to floor, condensate drains and nail plates are installed, man j updated with furnace on it, backdraft damper installed, duct blast test pass, air balance passed all items via text pics- still need framing completed around ducts- ongoing remodel on inside that hasnt started yet
|
Rough-in | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | PART |
Brian Scoles
|
|
|
For access please schedule with Travis at ###-#### Phone #: ###-#### Inspection requested via web by Travis Teichert- new addition partial R/I on attic and crawl ok- need framing completed around all duct work and metal pipe installed the attic and crawl- nail plates on lineset/condensate- rerotue condensate to relieve undo stress- need backdraft damper installed in outside air- recall in when all completed- need man J updated with furnace model number- this project will be ongoing in different phases- need to add dryer duct to permit and pay fee- airbalance report ok- need duct blast by final
|
Mec-Aging Inspection | 4/1/2020 | 4/1/2020 | 4/1/2020 | | CANC |
Brian Scoles
|
|
|
Called contractor he is waiting on homeowner to complete R/I- man j will need submitted to city of Boise- WIP
|
Application received | | | 9/6/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/6/2019 | | DONE |
|
|
|
|
Meeting | | | 9/6/2019 | | DONE |
|
|
|
Travis with Teichert services came in and had duct work added to permit
|