Final | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | PASS |
Brian Scoles
|
|
|
AC: 2018 Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok
|
Rough-in | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok
|
Pressure Test | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 20lb gas pass- tagged meter location
|
Rough-in | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- see pressure test notes for all corrections computer gliched on me somehow showed up there
|
Pressure Test | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves 1- gas gauge at 2psi 2- need to resubmit man j to city for approval for way ducting installed (R/A) or run per approved man j onsite R/A shows upstairs and installed downstairs 3- arma flex needs rips and tears fixed in wall bare copper can be seen 4- crawl ducting needs completed for R/I inspection 5- framing needs completed around supply duct 2nd floor and install metal ducting thru attic with draft stop
left notice front window
|
Issue PAID IN FULL permit | | | 9/6/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/6/2019 | | DONE |
|
|
|
This permit was created on the web by Gary Reeves
|