First Notice | 4/2/2020 | 4/2/2020 | 4/2/2020 | | DONE |
Brian Scoles
|
|
|
This permit finaled on the web by Stacia Haumann
|
Final | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PASS |
Brian Scoles
|
|
|
if questions call Lynn @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- gas piping final ok
|
Pressure Test | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Brian Scoles
|
|
|
if questions call Josh @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 60lb gas pass from meter to RTU tagged meter location
|
Pressure Test | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PART |
Brian Scoles
|
|
|
CALL PRIOR TO ARRIVAL - Jared w/ Russell Corp. ###-####. any other questions call Josh w/ DeBest @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 60lb gas pass underground exterior from meter location to bbq location- need to sleeve riser at bbq location before concrete is poured- ok to backfill- need RFI generated to show gas line removed from building to outside under ground to bbq- talked with general contractor about this
|
Issue PAID IN FULL permit | | | 9/24/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/18/2019 | | DONE |
|
|
|
This permit was created on the web by Stacia Haumann
|