Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Brian Scoles
|
|
|
Lockbox Code is CHE - Builder Contact: Chet ###-#### - HVAC Contact: Kelly ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
|
Final | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | FAIL |
Brian Scoles
|
|
|
Lockbox Code is CHE - Builder ###-#### - HVAC ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- microwave missing back draft damper and duct needs sealed to microwave
|
Final | 12/31/2019 | 1/3/2020 | 1/3/2020 | A | FAIL |
Brian Scoles
|
|
|
Lockbox Code: CHE Builder ###-#### HVAC ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks 1- range hood needs installed and sealed nothing installed 2- outside air in furnace closet needs insulated to R6
|
Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Brian Scoles
|
|
|
Builder Contact: Chet ###-#### HVAC Contact: Kelly ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- R/I ok- need to seal dryer duct to termination box at final- furnace closet will need combustion air or pipe furnace intake to outside at final
|
Pressure Test | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Brian Scoles
|
|
|
Builder Contact: Chet ###-#### HVAC Contact: Kelly ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- 20lb gas pass- needs inert tape thru exterior penetration by final
|
Issue PAID IN FULL permit | | | 9/25/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/25/2019 | | DONE |
|
|
|
This permit was created on the web by Arielle Hendricks
|