Final | 10/2/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Brian Scoles
|
|
|
final 3 furnaces 3 a/cs ok
|
Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | FAIL |
Brian Scoles
|
|
|
THIS INSPECTION IS FOR ROUGHIN/FINAL , PLEASE CALL GLEN WITH ANY QUESTIONS Phone #: ###-#### Inspection requested via web by Yvonne Bowman- need to add wet switch to 3 secondarys at coil location- need uv protection outside at lineset and seal all lineset penetrations weather tight- need to check valuation since 3 furnaces coils and a/cs were installed not RTU as listed
|
Telephone call | | | 10/1/2019 | | DONE |
|
|
|
Brian S called to have the scope of work update to 3 furnaces and 3a/cs for this project.
|
Issue PAID IN FULL permit | | | 9/30/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/30/2019 | | DONE |
|
|
|
This permit was created on the web by Yvonne Bowman
|
First Notice | 10/2/2019 | 10/2/2019 | | | |
Brian Scoles
|
|
|
|