Final | 12/28/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Brian Scoles
|
|
|
final inspection of 75k gas heater installed in shop behind the residence.. The only discrepancy found in final inspection is I had to add a third metal barrier in the wall for against the installation for the double wall exhaust stainless pipe to exit-all complete. Any time after 10AM AM or PM please text or call is fine, thanks Phone #: ###-#### Inspection requested via web by ron powell- final ok
|
Final | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | FAIL |
Jack Reynolds
|
|
|
Request final inspection of 75k heater for detached shop. pressure test inspection complete on line to shop, 2nd inspection done line to unit. Gas line is now to the unit and its operating. Electrical inspection passed and complete. Available after 10AM please. ###-#### Phone #: ###-#### Inspection requested via web by ron powell - need to installed insulation shield through wall to maintain 1" clearances to combustibles
|
Pressure Test | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Brian Scoles
|
|
|
Request inspection of gas line pressure test. LIne runs from ditch to inside of shop terminating where the 75k btu heater will hang. first inspection of the gas line in the ditch is complete. This inspection is after the line was added inside the shop. Available after 10AM but please call or text, thanks, Ron Phone #: ###-#### Inspection requested via web by ron powell- 20lb gas pass whole system
|
Pressure Test | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Brian Scoles
|
|
|
20lb gas pass underground only- ok for backfill
|
Pressure Test | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | NR |
Brian Scoles
|
|
|
Ron Powell Phone #: ###-####- need 2 anadised riser installed plastic pipe can not be installed above ground and 30lb max gauge at 20psi for pressure test
|
Issue PAID IN FULL permit | | | 11/5/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/17/2019 | | DONE |
|
|
|
This permit was created on the web by ron powell
|