Final | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | PASS |
Brian Scoles
|
|
|
fireplace final ok- mantel installed
|
Final | 1/15/2020 | 1/17/2020 | 1/17/2020 | A | NR |
Brian Scoles
|
|
|
Inspection requested via web by Brian Preece- still installing tile around fireplace- need installation instructions onsite none found
|
Conference | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | CANC |
Brian Scoles
|
|
|
should have been R/I
|
Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Brian Scoles
|
|
|
firep[lace R/I ok
|
Rough-in | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Preece- per 3.2 diagram page 28 shows minimum 3 inch clearance to framing to flue only has 2 inches
|
Issue PAID IN FULL permit | | | 10/21/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
This permit was created on the web by Brian Preece
|