Permit Information
Permit NumberMEC19-04768
StatusFinaled
Name AMERICAN CHILLER
Site Address 4203 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
New: New HVAC for 25 app along with offices and common areas
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/22/20207/23/20207/23/2020APASS
DetailsBen Livingston
Final inspection on Valor Point. call Adrian for any question. Phone #: ###-#### Inspection requested via web by adrian manzo
Final7/20/20207/20/20207/20/2020PPART
DetailsBen Livingston
Temp Final for a temporary occupancy on this project. Missing roof penetration caps. Call Adrian ###-#### for any Questions. Phone #: ###-#### Inspection requested via web by adrian manzo
- temp c.o.
Rough-in7/13/20207/14/20207/14/2020APASS
DetailsBen Livingston
partial final on 4th floor. call adrian ###-#### if any issues. valor point Phone #: ###-#### Inspection requested via web by adrian manzo
- 4th floor okay
Rough-in7/9/20207/10/20207/10/2020APASS
DetailsBen Livingston
inspection for a partial final on all 3rd floor units and common areas. call Adrian ###-#### for any questions or issues. valor Point Phone #: ###-#### Inspection requested via web by adrian manzo
- 3rd floor ok
Rough-in7/1/20207/2/20207/2/2020PPASS
DetailsBen Livingston
Inspection for all of 2nd floor interior partial final. Call adrian for any questions or issue. Valor point Phone #: ###-#### Inspection requested via web by adrian manzo
- 2nd floor rooms, and common areas part final.
Final6/25/20206/25/20206/25/2020PNR
DetailsBen Livingston
Inspection on partial-final for 1st floor both units and common areas only. Excluding the 1st floor outside louvers and ERV. T;B will be at the end of project. Nick 208-78-3004 will be the contact at Valor Point. Phone #: ###-#### Inspection requested via web by adrian manzo
- cant temp final the job yet
Rough-in6/25/20206/25/20206/25/2020PPASS
DetailsBen Livingston
Inspection on partial-final for 1st floor both units and common areas only. Excluding the 1st floor outside louvers and ERV. T;B will be at the end of project. Nick 208-78-3004 will be the contact at Valor Point. Phone #: ###-#### Inspection requested via web by adrian manzo
- first floor rooms and corridor okay temp final
- need labels on firesmoke damper access doors on final
Rough-in6/17/20206/18/20206/18/2020APASS
DetailsBen Livingston
Inspection to cover. This is for the 3rd floor corridors T-grid ceiling. Job 42359 Contact is Dusty at ###-####
Phone #: ###-#### Inspection requested via web by Kathy Youngkin
Rough-in6/15/20206/16/20206/16/2020APASS
DetailsBen Livingston
Inspections for cover on 3rd floor laundry area. Phone #: ###-#### Inspection requested via web by adrian manzo
- fire smoke damper angles 3rd and 4th floor
- above hard lid laundryroom okay,and 4thfloor okay
Final6/11/20206/12/20206/12/2020AFAIL
DetailsBen Livingston
Partial final for the 1st floor units interior at valor point. Nick will be the contact. Phone #: ###-#### Inspection requested via web by adrian manzo
- need 2nd condensate drain
Rough-in6/11/20206/12/20206/12/2020APASS
DetailsBen Livingston
inspection for cover on hallway on 2nd floor at Valor Point. Nick will be the contact onsite. Phone #: ###-#### Inspection requested via web by adrian manzo
- 2nd floor hallway okay
- fire smoke damper angles okay 1st and 2nd floor
Rough-in6/2/20206/3/20206/3/2020APASS
DetailsBen Livingston
re-inspection of the shaft on the equipment/ duct on all floors. Dusty will be onsite. valor point Phone #: ###-#### Inspection requested via web by adrian manzo
-2nd,3rd,4thfloor inside shaft firesmoke damper angles x3
- 2nd,3rd,4th floor corridor duct seal ok
Rough-in6/2/20206/2/20206/2/2020PFAIL
DetailsBen Livingston
inspect all shaft equipment / duct on all floor for covering shaft. Dusty is on-site. Valor Point. Phone #: ###-#### Inspection requested via web by adrian manzo
- need 16 ga angle on fire smoke dampers
Rough-in5/29/20205/29/20205/29/2020PPASS
DetailsBen Livingston
Nick on-site. Inspection for ceiling grid grille on 1st floor for cover. Phone #: ###-#### Inspection requested via web by adrian manzo
- 1st floor grille ok
Rough-in5/22/20205/22/20205/22/2020PPASS
DetailsBen Livingston
GC is request for inspection on one fire/smoke damper in hallway by elevator for lid cover. Nick will be on site ###-####. Valor Point 42359 Phone #: ###-#### Inspection requested via web by adrian manzo
- 1st fllor firesmoke damper angle above exit door bye elevator
Rough-in5/19/20205/20/20205/20/2020APASS
DetailsBen Livingston
Rough-in on fire/smoke dampers on Valor Point 42359. Call Dusty Phone #: ###-#### Inspection requested via web by adrian manzo
- firesmoke damper clearence 6 dampers 1st,2nd,3rd floor corridors by elevator, 1st floor by mail box
-1st flloor in room bye shaft 1 FSD still remains
Rough-in5/6/20205/7/20205/7/2020APASS
DetailsBen Livingston
Request a rough in to cover inspection on the 4th floor bathrooms and also 1 bathroom on the 1st floor. This is for Valor Pointe job 42359. ACS contact is Dusty ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin
-4th floor bathrooms and also 1 bathroom on the 1st floor okay
Conference5/5/20205/5/20205/6/2020PPASS
DetailsBen Livingston
The GC would like to have a meeting on regards to the fire/smoke dampers. Per the GC the dampers are installed correctly. Call Dusty ###-#### Phone #: ###-#### Inspection requested via web by adrian manzo
Rough-in5/5/20205/5/20205/5/2020APASS
DetailsBen Livingston
Rough-in for cover on bathrooms on 2nd ;3rd floors. Nick is contact for our job 42359. Phone #: ###-#### Inspection requested via web by adrian manz
- 2nd ;3rd fllor bathrooms okay
Rough-in5/1/20205/4/20205/4/2020APASS
DetailsBen Livingston
rough in for cover on 1st floor bathroom ceiling. Dusty is contact on-site ###-####. Job#42359 Phone #: ###-#### Inspection requested via web by adrian manzo
- 1st floor bathroom above ceiling okay
- 2 firesmoke dampers at each end of 1st floor corridor clearence ok
Rough-in4/29/20204/30/20204/30/2020APASS
DetailsBen Livingston
Rough-in inspection of 4th floor supply duct at Valor Pointe job 42359. ACS contact is Dusty ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin
- 4th floor supply ins. okay
Rough-in4/27/20204/28/20204/28/2020APASS
DetailsBen Livingston
Duct seal inspection on supply ducts for 4th floor. Dusty will be the contact at ###-####. (Our job #42359) Phone #: ###-#### Inspection requested via web by adrian manzo
- suply duct seal 4th floor
Rough-in4/23/20204/24/20204/24/2020APASS
DetailsBen Livingston
Request rough-in for 4th floor exhaust duct to cover at Valor Pointe, our job 42359. ACS contact is Dusty ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin
- 4th floor exhaust duct seal okay
Conference4/22/20204/22/20204/22/2020ACANC
DetailsBen Livingston
Conference4/22/20204/22/20204/22/2020ADONE
DetailsChad Schwendiman
Went by to meet Ben and look at the dryer duct design. I called and spoke with the Engineer about the dryer vents. Genral Contractor will send in an RFI and he will respond to it. Sounds like they are probably going to switch them to individule 4" rounds.
Rough-in4/20/20204/21/20204/21/2020PFAIL
DetailsBen Livingston
1st 2nd 3rd floor duct / seal inspection. Dusty on site contact ###-####. Valor Point 42359 Phone #: ###-#### Inspection requested via web by adrian manzo
- firesmoke dampers on 1st,2nd and3rd floor need tobe installed per manufactures instructions
- dryer duct needs a clean out at end capped end and may need a booster fan to maintain exhaust velocity please RFI
Rough-in4/9/20204/10/20204/10/2020APASS
DetailsBen Livingston
Requesting rough-in to cover on 3rd floor insulation. Also, 1st, 2nd and 3rd floor re-inspection of duct sealing on exhaust to cover. This is for our job 42359. ACS contact is Dusty ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin
rough-in to cover on 3rd floor insulation. Also, 1st, 2nd and 3rd floor re-inspection of duct sealing on exhaust to cover.
Rough-in3/30/20203/31/20203/31/2020APASS
DetailsBen Livingston
Requesting rough-in for duct work on supply fans for 1st and 2nd floor.
Requesting rough-in for ductwork on 3rd floor. This is the Valor Pointe job 42359. ACS contact is Dusty ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin
- 1st and 2nd floor suply duct innsulation
- 3rd floor soffit duct seal
Rough-in3/24/20203/27/20203/27/2020APASS
DetailsBen Livingston
Rough-in to cover 1st floor Call Dusty ###-#### Phone #: ###-#### Inspection requested via web by adrian manzo
- 1st and 2nd floor exhaust duct in soffit ok
- 1st and 2nd floor supply duct in rooms duct seal
Issue PAID IN FULL permit  10/21/2019 DONE
Payment received via Govolutions
Application received  10/21/2019 DONE
This permit was created on the web by adrian manzo
First Notice7/23/20207/23/2020   