Final | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
Brian Scoles
|
|
|
Dale Phone #: ###-####- final ok- 5lb flue pass
|
Final | 12/26/2019 | 12/26/2019 | 12/26/2019 | P | FAIL |
Brian Scoles
|
|
|
call for access // Dale Phone #: ###-#### 1- need uv protection on line set outside at condenser and level condenser pad 2- need to seal line set and gas piping exterior penetrations weather tight 3- need to witness flue test 4- need combustion air for furnace/wh closet 5- need to remove gas gauge at meter and plug off 6- need to firecaulk pvc flue from furnace and w/h b vent at ceiling in closet
left notice front of furnace
|
Pressure Test | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Chad Schwendiman
|
|
|
Dale Phone #: ###-#### - 20lb gas pass.
|
Rough-in | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | CANC |
Brian Scoles
|
|
|
Dale Phone #: ###-#### Phone #: ###-####
|
Pressure Test | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | CANC |
Brian Scoles
|
|
|
Dale Phone #: ###-#### Phone #: ###-####- per text from contractor
|
Rough-in | 10/22/2019 | 10/24/2019 | 10/24/2019 | A | CANC |
Brian Scoles
|
|
|
CANCEL AND RESCH Dale Phone #: ###-####
|
Pressure Test | 10/22/2019 | 10/24/2019 | 10/24/2019 | A | CANC |
Brian Scoles
|
|
|
CANCEL AND RESCH Dale Phone #: ###-####
|
Application received | | | 10/22/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/2019 | | DONE |
|
|
|
|