Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Ben Livingston
|
|
|
Combustion air provided by Lou reed door Phone #: ###-#### Inspection requested via web by Nathan Britzius
|
Rough-in | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Nathan Britzius
|
Rough-in | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | FAIL |
Ben Livingston
|
|
|
Replaced drain tubing with PVC Phone #: ###-#### Inspection requested via web by Nathan Britzius - need to use barbed fitting to connect tubing to pvc -
|
Rough-in | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Nathan Britzius - plastic tubing not approved condensate material -
|
Pressure Test | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Ben Livingston
|
|
|
Nate Phone #: ###-#### -20lb -
|
Rough-in | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | FAIL |
Ben Livingston
|
|
|
Nate Phone #: ###-#### - plastic tubing not approved condensate material -
|
Miscellaneous action | | | 11/21/2019 | | DONE |
|
|
|
Permit was pulled with fixture refigeration piping 1000 sq.ft and over. Removed fixture and added difference in fee based on value.
|
Issue PAID IN FULL permit | | | 10/28/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/28/2019 | | DONE |
|
|
|
This permit was created on the web by Nathan Britzius
|
First Notice | 1/14/2020 | 1/14/2020 | | | |
Ben Livingston
|
|
|
|