Final | 7/10/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
Eric Strole
|
|
|
Builder: ###-#### - HVAC: ###-#### *There is a key to the left of the front door in the electrical outlet. Phone #: ###-#### Inspection requested via web by Arielle Hendricks
|
Final | 7/9/2020 | 7/10/2020 | 7/10/2020 | P | FAIL |
Ben Livingston
|
|
|
Builder: ###-#### - HVAC: ###-#### *There is a key to the left of the front door in the electrical outlet. Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 1 condencer is missing locking cap - didnt see blast test report
|
Mec-Aging Inspection | 6/3/2020 | 6/3/2020 | 6/3/2020 | | CANC |
Ben Livingston
|
|
|
wip
|
Pressure Test | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Ben Livingston
|
|
|
-Fireplace gas piping passed -
|
Pressure Test | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | FAIL |
Ben Livingston
|
|
|
- need access door for gas valve - - gas line needs tobe connected bye hvac contractor and add a nipple so appliance connector stays in fireplace cabinet - - need to address gas piping issues at fireplace-
|
Rough-in | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Ben Livingston
|
|
|
Builder: ###-#### - HVAC: ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
|
Pressure Test | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Ben Livingston
|
|
|
Builder ###-#### - HVAC ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 60lb - - 5lb x3 -
|
Rough-in | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | FAIL |
Ben Livingston
|
|
|
Builder ###-#### - HVAC ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - some insulation in attic is coming off the duct - - duct in garage needs tobe min 26ga metal, no flex -
|
Issue PAID IN FULL permit | | | 11/4/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/4/2019 | | DONE |
|
|
|
This permit was created on the web by Arielle Hendricks
|