Final | 12/17/2019 | 12/18/2019 | 12/18/2019 | P | PASS |
Jack Reynolds
|
|
|
call for access- Santiago Phone #: ###-#### - final ok
|
Final | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | FAIL |
Jack Reynolds
|
|
|
call for lock box code // Santiago Phone #: ###-#### - furnace needs electrical wiring finished - dryer vent needs finished - furnace flue and all work in attic has not been inspected. need access
|
Pressure Test | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Jack Reynolds
|
|
|
call for lock box code // Santiago Phone #: ###-#### - 20lb gas pressure test ok
|
Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | NH |
Jack Reynolds
|
|
|
Santiago Phone #: ###-#### - called number in notes - no access to house
|
Fees Due Hold | 12/3/2019 | | 12/5/2019 | | DONE |
|
|
|
|
Final | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | FAIL |
Jack Reynolds
|
|
|
Los box on front door code 208 Phone #: ###-#### Inspection requested via web by santiago ramirez
-condensate in crawl needs slope - line set insulation at furnace needs repaired and supported in the crawl - duct work between furnace and coil needs insulation installed - duct work needs added to permit and inspected - several exhaust fans need added to permit and inspected - dryer vent needs added to permit - range hood venting needs added to permit and smooth walled duct installed - gas line to range needs added to permit and pressure tested - A/C needs locking caps installed on service ports
|
Issue PAID IN FULL permit | | | 11/13/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/13/2019 | | DONE |
|
|
|
This permit was created on the web by santiago ramirez
|