Final | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Brian Scoles
|
|
|
Mechanical Gas Fireplace Final Inspection. Manual is in kitchen drawer. Garage Code: 4321 Phone #: ###-#### Inspection requested via web by Dan Otero- fireplace final x 2 ok
|
Final | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | NH |
Brian Scoles
|
|
|
Mechanical Gas Fireplace Final Inspection. Manual is in kitchen drawer. Please contact: Robert @ ###-#### before heading there. Phone #: ###-#### Inspection requested via web by Dan Otero- called number listed no answer- went by house all locked up
|
Rough-in | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | PASS |
Ben Livingston
|
|
|
Mechanical Gas Fireplace Rough-In Inspection Phone #: ###-#### Inspection requested via web by Dan Otero - fireplace x2 -
|
Rough-in | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | FAIL |
Brian Scoles
|
|
|
Mechanical Gas Fireplace Rough-In Inspection Phone #: ###-#### Inspection requested via web by Dan Otero- horizontal piping needs 3" clearance on top of pipe- need to install plywood in framing in attic around flue framing so no insulation can get in- pipe used does not have label on it pipe, one piece of pipe is painted black need to replace off fireplace in bathroom- living room fireplace ok- need to update permit to new construction for 2 fireplaces and change valuation and pay fees this is not an alteration
|
Telephone call | | | 1/2/2020 | | DONE |
|
|
|
Spoke with woman on the phone, inspector said to add 2nd fireplace to scope of work and change the final valuation to double original amount. Changed scope of work and added 2nd fireplace to fixtures.
|
Issue PAID IN FULL permit | | | 11/26/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/26/2019 | | DONE |
|
|
|
This permit was created on the web by Dan Otero
|