Final | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Brian Scoles
|
|
|
call Joe ###-#### for access code Phone #: ###-#### Inspection requested via web by Joe Taylor- final ok
|
Rough-in | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Brian Scoles
|
|
|
Joe Phone #: ###-####- R/I ok
|
Pressure Test | 12/30/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Brian Scoles
|
|
|
Joe Phone #: ###-####-m 20lb gas pass tagged meter location
|
Rough-in | 12/26/2019 | 12/27/2019 | 12/27/2019 | P | FAIL |
Brian Scoles
|
|
|
ADD P TEST Phone #: ###-#### Inspection requested via web by Joe Taylor- 1- gas gauge wont zero out/ install temp shuitoff valve between gauge and gas piping 2- need city stamped approved man j onsite for inspection none fopund 3- gas line penetration at meter needs 10 mil tape installed remove foam seal and install tape 4- water heater b vent insulation shield needs 1" clearance to b vent
left notice front window
|
Pressure Test | 12/26/2019 | 12/27/2019 | 12/27/2019 | P | FAIL |
Brian Scoles
|
|
|
ADD ROUGH IN Phone #: ###-#### Inspection requested via web by Joe Taylor- gas gauge wont zero out- 5lb flue pass
|
Issue PAID IN FULL permit | | | 12/19/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/19/2019 | | DONE |
|
|
|
This permit was created on the web by Joe Taylor
|