Final | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Brian Scoles
|
|
|
Final inspection building 12 - please contact shawn @ ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- final ok all units-6 fire dampers ok- signed occupancy card
|
Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Brian Scoles
|
|
|
Final inspection building 12 - please contact shawn @ ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- R/I 6 fire dampers ok-clearances and one sided angles ok
|
Final | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | CANC |
Brian Scoles
|
|
|
Building 12 final re-inspection Phone #: ###-#### Inspection requested via web by Amanda Casper- should have been R/I inspection
|
Rough-in | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Brian Scoles
|
|
|
Building 12 final re-inspection Phone #: ###-#### Inspection requested via web by Amanda Casper- framing 6 fire dampers clearances with sheetrock ok- ok fo install sleeve with fire damper and install with angle- went over with Dan onsite
|
Final | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | FAIL |
Brian Scoles
|
|
|
Building 12 final reinspection - please call shawn @ 2089602011 Phone #: ###-#### Inspection requested via web by Amanda Casper- K105 106 205 206 305 and 306 need fire dampers installed per installation instructions went over with Dan and GC onsite- need to inspection called in for framing and sheetrock prior to installing fire dampers- K101 102 103 104 201 202 203 204 301 302 30 and 304 are ok-
|
Final | 6/16/2020 | 6/17/2020 | 6/17/2020 | P | FAIL |
Brian Scoles
|
|
|
Final Inspection building 12 for towers 1, 2 and 3 - please contact shawn @ ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper 1- still need fire damper installation onsite and inspected- meet onsite with ladder 2- need locking caps on all A/Cs 3- K101-104 need wet switches install and all need wired for safety shutoff 4- K101 and 105 need lineset supported outside at a/c location- 5 need all dryer duct lengths permanently tagged all units
|
Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | FAIL |
Brian Scoles
|
|
|
Rough in inspection for Building 12, 6 units.. with and questions contact Shawn @ ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- need fire damper installations onsite only had 1 page- need to remove 6 plastic grill for outside air and possibly siding around all dampers to verify clearances-
|
Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PART |
Brian Scoles
|
|
|
Rough In inspection Building #12. @ 2 pm if possible. Please call Shawn at ###-#### with any questions Phone #: ###-#### Inspection requested via web by Amanda Casper- units K 101 102 103 104 201202 203 and 204 seal on duct ok- ok to cover- units K105 106 205 206 305 and 306 still need engineer to submit drawings to city for review on fire dampers that were missed and have approved drawings onsite to grant cover on these units- GC was not onsite to talk to- call in R/I when fire dampers have been addressed and approved thru city and onsite
|
Rough-in | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PART |
Brian Scoles
|
|
|
Pre rock rough in inspection building #12 west tower. 10am if possible, please call Shawn Marquez with any questions @ ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- seal on ducts in units K105 106 205 and 206 ok to sheetrock excluding above furnace and closet lids until approved drawings for fire dampers have been submitted to city for review and approved and onsite
|
Rough-in | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PART |
Brian Scoles
|
|
|
Rough In inspection Building #12, 3rd Floor. Please call Shawn at ###-####with any questions Phone #: ###-#### Inspection requested via web by Amanda Casper- R/I units K 301 302 303 and 304 ok ok to cover- units K 305 and 306 ok to cover excluding closet ceiling and above furnace- need drawing from engineer for fire damper installations in fire wall for documentation and submit to city for review- Shawn looking into this
|
Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PART |
Brian Scoles
|
|
|
Pre rock rough in inspection, 1st floor. 10am if possible. Please call Shawn with questions at ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- pre rock on exhaust fans and linesets K 101 102 103 104 105 and 106 ok- ok to cover pre rock only
|
Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PART |
Brian Scoles
|
|
|
Pre rock rough in inspection. 10am if possible, please call Shawn Marquez with any questions. Phone #: ###-#### Inspection requested via web by Amanda Casper- pre rock inspection on K 201 202 203 204 205 and 206 ok- exhaust fans and linesets ok all 6 units
|
Rough-in | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PART |
Brian Scoles
|
|
|
Rough in for pre rock. 3RD floor only. 10am if possible with inspectors schedule. Please call Shawn Marques with any issues, ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- 3rd floor K 310 302 303 304 305 and 306 pre rock ok
|
Rough-in | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | CANC |
Brian Scoles
|
|
|
Close to 10am would be optimal, if possible with inspectors schedule. Please contact Shawn Marquez with any issues. ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- all fire dampers need removed- will need to meet 1 hour rating on exhaust fan- Shawn will get with building inspector after dampers are remove to see how to meet 1 hour rating on fan- rerschedule when ready
|
Rough-in | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | CANC |
Brian Scoles
|
|
|
Rough in for pre rock. Please call Shawn Marques with any issues. ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- rescheduled as conference and met contractor onsite
|
Conference | 1/8/2020 | 1/8/2020 | 1/8/2020 | A | DONE |
Brian Scoles
|
|
|
Rough in for pre rock. Please call Shawn Marques with any issues. ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- met with Shawn and Dan to walk job onsite- looked at exhaust ducting and dryer ducting thru rated assemblies- way installed doesnt match approved drawings so will be getting more info on hows installed- need verification on fire rated flex and radiant dampers being used- will relay to contractor when I get info
|
Issue PAID IN FULL permit | | | 1/7/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/7/2020 | | DONE |
|
|
|
This permit was created on the web by Amanda Casper
|
First Notice | 7/1/2020 | 7/1/2020 | | | |
Brian Scoles
|
|
|
|