Conference | 4/16/2020 | 4/16/2020 | 4/17/2020 | P | DONE |
Chad Schwendiman
|
|
|
1:00 - They scheduled a conference for us to go by and look at the steel structure that has been installed as a curb for the new AHU. This is all structrual steel supports so we don't do the inspections on it, and that it would have to either be special inspections or a structrual inspector. I explained to them that I had spoken with Terry the previous day and that St. Al's needs to submit for a building permit and get the plans approved by the city. This is in the works and will need to be completed before we can preform an Inspection. Additionally they need to get the steel structure approved before covering it up.
|
Conference | 4/15/2020 | 4/16/2020 | 4/16/2020 | P | DONE |
Brian Scoles
|
|
|
please call Dru prior to arrival to set time and access location. This is a conference. ###-#### Phone #: ###-#### Inspection requested via web by Nicholas Paige- Met with Chad and Dru onsite- see Chad S notes
|
Issue PAID IN FULL permit | | | 1/28/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/24/2020 | | DONE |
|
|
|
This permit was created on the web by Nicholas Paige
|