Final | 5/5/2020 | 5/5/2020 | 5/6/2020 | P | PASS |
Jack Reynolds
|
|
|
call Brian Shoecraft at ###-#### for access information if needed please. Phone #: ###-#### Inspection requested via web by Andrea Creek - final ok
|
Final | 4/29/2020 | 5/4/2020 | 5/4/2020 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek - A/C needs locking caps installed
|
Rough-in | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek - R/I ok - combustion air for laundry/ mech room will need to follow IECC 2015 R402.4.4 with a gasketed door at final or pipe combustion air for furnace into attic and install a high and low openings into house for water heater by final
|
Pressure Test | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek - need inert tape at pipe wall penetration - - 20lb ,5lb test okay -
|
Rough-in | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek - manual J calls for 4" ventalation duct to return plenum - - range vent needs tobe roughed in -
|
Issue PAID IN FULL permit | | | 2/5/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/5/2020 | | DONE |
|
|
|
This permit was created on the web by Andrea Creek
|