Final | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | PASS |
Brian Scoles
|
|
|
new build // Tyler Phone #: ###-####- final ok
|
Rough-in | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PASS |
Brian Scoles
|
|
|
Tyler *screened* Phone #: ###-####- R/I ok- transfers will be cut in on final- need picture of range duct support at final homeowner will provide wants to get range hood spot on before securing into place
|
Rough-in | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | FAIL |
Brian Scoles
|
|
|
Tyler *screened* Phone #: ###-#### 1- need transfer to bedroom and laundry 2- need to seal all spotwelds on register cans 3- need to complete range hood ducting 4- fresh air needs 10' from exhaust- homeowner will relocate exhaust penetration to roof
|
Pressure Test | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PASS |
Brian Scoles
|
|
|
*screened* Tyler Phone #: ###-####- 20lb gas pass- tagged meter location
|
Pressure Test | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | FAIL |
Brian Scoles
|
|
|
Tyler Phone #: ###-####- need approved coupling installed in gas line thread protector not approved coupling- retest when fixed
|
Conference | 4/14/2020 | 4/14/2020 | 4/14/2020 | A | DONE |
Brian Scoles
|
|
|
meet at 1030 am- met with home owner about sheetrocking garage only- he stated he had stuff stolen and wants to complete garage to lock everything up- there will be no mechanical work needing to be inspected in the garage- will be able to see all R/I on house thru interior walls of house- ok to cover garage only
|
Conference | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | DONE |
Brian Scoles
|
|
|
Tyler Phone #: ###-####- discussed all functions of new construction installation for home
|
Application received | | | 3/2/2020 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/2/2020 | | DONE |
|
|
|
|