DOC - Permit Finaled | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Ben Livingston
|
|
|
|
Final | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Ben Livingston
|
|
|
Dave - Gas line Phone #: ###-#### - 20lb piping
|
Pressure Test | 4/15/2020 | 4/16/2020 | 4/16/2020 | P | FAIL |
Ben Livingston
|
|
|
The last 5''of the barbecue line is not strapped.There is a deck being built that it will be strapped too. I can provide a picture after its built if the inspector so wishes. Please contact me if there is a concern. Thank you! Phone #: ###-#### Inspection requested via web by David Dixon - both gauges didnt zero out, - all fittings and riser pipe need tobe covered with the 10mil tape
|
Issue PAID IN FULL permit | | | 4/15/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/15/2020 | | DONE |
|
|
|
This permit was created on the web by David Dixon
|