Final | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Jack Reynolds
|
|
|
- insulation shield on vent ok - final ok
|
Rough-in | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Jack Reynolds
|
|
|
Ive made the correction and need a reinspection Phone #: ###-#### Inspection requested via web by Travis McMillan - R/I ok
|
Pressure Test | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Jack Reynolds
|
|
|
Ive made the correction and need a reinspection Phone #: ###-#### Inspection requested via web by Travis McMillan - 60lb gas test ok - tagged meter location
|
Pressure Test | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | FAIL |
Jack Reynolds
|
|
|
This is a unit heater in a gas pipe job so I need you to expect the rough-in and final for the unit heater and witness the gas pressure which is going to be on 2 p.m. Inspection requested via web by Travis McMillan - 60lb gas pressure test fail/ All gas lines installed need tested - gas line at old building front of lot needs supported - all gas line penentrations through building need protective coating installed - all appliances needs a shut off valve/ drip leg/ reg/ drip leg installed -need to see clearnaces on venting for unit heater and pressure washer if combustibles are with in construction of roof - Permit is on the wrong address and needs adjusted. Should be on 5100 Bethel
|
Issue PAID IN FULL permit | | | 4/22/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/22/2020 | | DONE |
|
|
|
This permit was created on the web by Travis McMillan
|
First Notice | 5/14/2020 | 5/14/2020 | | | |
Jack Reynolds
|
|
|
|