Final | 7/30/2020 | 7/31/2020 | 7/31/2020 | P | PASS |
Brian Scoles
|
|
|
Mechanical Final Needed for Late PM will send Air Balance as soon as we receive it.Call Karl with any questions. Phone #: ###-#### Inspection requested via web by Karl Hestekin- final ok- airbalance ok- equipment under hoods ok
|
Card not on site to sign | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | PASS |
Brian Scoles
|
|
|
Mechanical Final Needed for Late PM will send Air Balance as soon as we receive it.Call Karl with any questions. Phone #: ###-#### Inspection requested via web by Karl Hestekin- no card onsite to sign
|
Rough-in | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PART |
Brian Scoles
|
|
|
Mechanical Grid Inspection for Kitchen As Soon As Possible. Please Contact Karl With Any Questions. ###-####. Phone #: ###-#### Inspection requested via web by Karl Hestekin- need 18" clear to top of hood for MAU ducting thats flexed will need to be hard piped- ok for ceiling tiles in kitchen excluding where work will take place- went over with GC and installer and talked to Karl by phone
|
Rough-in | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | CANC |
Brian Scoles
|
|
|
Grid Inspection Needed at Costa Vida as soon as possible.Please contact Karl with any questions ###-#### Phone #: ###-#### >> Inspection requested via web by Karl Hestekin Inspection cancelled from web by: Karl Hestekin
|
Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Chad Schwendiman
|
|
|
2nd.. layer Fire Wrap Inspection needed for am. please call Karl with any questions. Phone #: ###-#### Inspection requested via web by Karl Hestekin Fire wrap okay
|
Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | PASS |
Chad Schwendiman
|
|
|
1st. layer Fire Wrap Inspection needed for am. please call Karl with any questions. Phone #: ###-#### Inspection requested via web by Karl Hestekin - okay to install 2nd layer of fire wrap on the large hood
|
Rough-in | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | PART |
Chad Schwendiman
|
|
|
Grease duct inspection needed please call Karl with any questions ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin - Okay to install 1st layer of fire wrap on the big hood, okay to install 2nd layer fire wrap on the small hood. Okay to cover dinning room ceiling
|
Rough-in | 7/24/2020 | 7/27/2020 | 7/27/2020 | P | PART |
Chad Schwendiman
|
|
|
Grid inspection Monday for Costa-Vida please contact Karl with any questions Phone #: ###-#### Inspection requested via web by Karl Hestekin - Ceiling not ready for inspection. Grease duct on small hood on exterior wall okay to insulate. Need to adjust grease duct on large hood. Went over with contractor on site.
|
Rough-in | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | PART |
Brian Scoles
|
|
|
Drop ceiling inspection needed for AM at Subway Nampa can contact Rob ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin- seal on supply return MAu ok- ok for insulation above grid- recall in when insulation completed and registers installed- need to look at grease duct too
|
Rough-in | 6/30/2020 | 6/30/2020 | 6/30/2020 | A | PART |
Brian Scoles
|
|
|
pics sent of insulation above hard lid hallway- ok to cover
|
Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PART |
Brian Scoles
|
|
|
Can I get a hard lid inspection if you have questions contact Rob ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin- hard lid for office and walk in cooler area- ok to sheetrock back hallway seal on duct ok- ok to insulate- send pic of insulation on supply then can cover hallway- talk to Rob about this
|
Conference | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | DONE |
Chad Schwendiman
|
|
|
Conference call needed as soon as possible contact karl at ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin - Met Karl on site to talk about class 1 hoods
|
Rough-in | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | CANC |
Chad Schwendiman
|
|
|
Mechanical Rough-in Needed for today contact Karl with any questions Phone #: ###-#### Inspection requested via web by Karl Hestekin
|
Rough-in | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | CANC |
Brian Scoles
|
|
|
Mechanical Rough-in Needed contact Karl with any questions Phone #: ###-#### >> Inspection requested via web by Karl Hestekin Inspection cancelled from web by: Karl Hestekin
|
Conference | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | CANC |
Brian Scoles
|
|
|
Conference call needed as soon as possible contact karl at ###-#### thank you Phone #: ###-#### >> Inspection requested via web by Karl Hestekin Inspection cancelled from web by: Karl Hestekin
|
Issue PAID IN FULL permit | | | 5/21/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/21/2020 | | DONE |
|
|
|
This permit was created on the web by Karl Hestekin
|
First Notice | 7/31/2020 | 7/31/2020 | | | |
Brian Scoles
|
|
|
|