Rough-in | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | PASS |
Jack Reynolds
|
|
|
Please call Josh Moran prior to arrival at ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby - R/I hvac only DO NOT COVER until all mech work has been seen - fireplace needs permit issued by installers and inspected - water heater flue will need inspected - adjust permit details to reflect work being done bathroom exhaust, range, dryer vent - electric heat will need to be verified to man J and is being done by others
|
Pressure Test | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | PASS |
Jack Reynolds
|
|
|
Please call Josh Moran prior to arrival at ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby - 20lb gas test ok - tagged meter location
|
Rough-in | 5/25/2020 | 5/26/2020 | 5/26/2020 | P | PART |
Jack Reynolds
|
|
|
Please call Chris Matos prior to arrival to ensure ready for inspection. ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby - line sets and condensate lines partial R/I only ok - project looks to still need exhaust fans installed, electric heaters and possibly a fireplace all done by others. hvac contractor is only doing the mini split - all other work will need to be seen before R/I cover is given
|
Issue PAID IN FULL permit | | | 5/25/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/25/2020 | | DONE |
|
|
|
This permit was created on the web by Andrea Grigsby
|