Rough-in | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kelton Tackett- R/I ok- insulation ok- need 10mil inert tape exterior penetration at meter location by final
|
Pressure Test | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kelton Tackett- 20lb gas pass tagged meter location
|
Fees Due Hold | 6/9/2020 | | 6/15/2020 | | DONE |
|
|
|
|
Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PART |
Brian Scoles
|
|
|
Partial rough in for approval to insulate duct Phone #: ###-#### Inspection requested via web by Kelton Tackett- seal on duct ok- ok to insulate- DO NOT COVER til R/I inspection is completed and gas piping installed and pressure tested- call in when insulation is done and gas piping installed- exhaust fans ok- outside air will need insulated
|
Issue PAID IN FULL permit | | | 6/1/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/1/2020 | | DONE |
|
|
|
This permit was created on the web by Kelton Tackett
|