Final | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | PASS |
Brian Scoles
|
|
|
Please call ahead to Hugh when headed out to the residence Phone #: ###-#### Inspection requested via web by Sarah Small- furnace a/c coil co locking caps ok- correction on a/c made
|
Final | 7/1/2020 | 7/8/2020 | 7/8/2020 | A | FAIL |
Brian Scoles
|
|
|
Please call ahead to Megan @ ###-#### when headed out to the residence Phone #: ###-#### Inspection requested via web by Sarah Small- condenser does not meet minimum 3 feet clearance to natural gas regulator- condenser needs turned 180 degrees to get electrical away from regulator-lineset will needs supported 3.5 inches above ground- will need locking caps on a/c service ports at final- recall in when condenser has been moved
|
Final | 6/19/2020 | 6/24/2020 | 6/24/2020 | A | NH |
Brian Scoles
|
|
|
Please call ahead to Megan @ ###-#### when headed out to the residence Phone #: ###-#### Inspection requested via web by Sarah Small- per phone call with homeowner no one home- she will reschedule with contractor
|
Issue PAID IN FULL permit | | | 6/15/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/15/2020 | | DONE |
|
|
|
This permit was created on the web by Sarah Small
|