Pressure Test | 7/18/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Jack Reynolds
|
|
|
reinspect corrections. Phone #: ###-#### Inspection requested via web by David Dixon - 20lb gas test ok - tagged meter location
|
Pressure Test | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | FAIL |
Brian Scoles
|
|
|
pressure whiteness gas line to package unit on roof. Phone #: ###-#### Inspection requested via web by David Dixon- 1- both penetrations thru wall at meter and on roof need 10 mil tape installed- 2- vertical csst in wall need supports removed needs to be free floating 3- need csst approved nail plates in exterior wall on horizontal gas piping 4- retest whole system once corrections are made
|
Issue PAID IN FULL permit | | | 7/17/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 7/17/2020 | | |
|
|
|
|
Application received | | | 7/17/2020 | | DONE |
|
|
|
This permit was created on the web by David Dixon
|