Rough-in | 7/24/2020 | 7/27/2020 | 7/27/2020 | A | PASS |
Jack Reynolds
|
|
|
Rough-in inspection for cover. Preston will be on-site contact. Phone #: ###-#### Inspection requested via web by adrian manzo - R/I ok
|
Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 | P | FAIL |
Jack Reynolds
|
|
|
Request rough-in inspection. ACS contact is Wayne Coder ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin - all exhaust fans need 26 gauge metal ducting ran continuous from fan to existing duct work before penetrating rated horizantal assembly - flex ducting can't penetrate wall. Sleeve with metal ducting
|
Issue PAID IN FULL permit | | | 7/17/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/17/2020 | | DONE |
|
|
|
This permit was created on the web by Kathy Youngkin
|