DOC - Permit Finaled | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Brian Scoles
|
|
|
call before 45min. before going Phone #: ###-#### Inspection requested via web by Rene Neumeyer- log set ok- damper clamp installed- co installed- virtual video onsite with installer
|
Rough-in | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | CANC |
Brian Scoles
|
|
|
call before 45min. before going Phone #: ###-#### Inspection requested via web by Rene Neumeyer- should have been pressure test and final- virtual video onsite with installed
|
Pressure Test | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Brian Scoles
|
|
|
call before 45min. before going Phone #: ###-#### Inspection requested via web by Rene Neumeyer- 20lb gas pass csst sleeved thru concrete
|
Issue PAID IN FULL permit | | | 8/4/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/4/2020 | | DONE |
|
|
|
This permit was created on the web by Rene Neumeyer
|