INSP - Final | 8/24/1995 | 8/25/1995 | 8/25/1995 | P | PASS |
Dave Lightfoot
|
|
|
08/24/95 337 - ready am on friday FNL -OK FINAL GAS TEST OK 25795
|
INSP - Final | 8/24/1995 | 8/25/1995 | 8/25/1995 | A | PASS |
Dave Lightfoot
|
|
|
|
INSP - Retro Fit (check note) | 8/24/1995 | 8/25/1995 | 8/25/1995 | A | PASS |
Dave Lightfoot
|
|
|
GAS TEST OK/25795..WATER HEATER AND FURNACE OK/FINAL/40 MIN
|
INSP - Final | 8/24/1995 | 8/25/1995 | 8/25/1995 | P | PASS |
Dave Lightfoot
|
|
|
08/24/95 337 - ready am on friday FNL -OK FINAL GAS TEST OK 25795
|
INSP - Final | 8/24/1995 | 8/25/1995 | 8/25/1995 | A | PASS |
Dave Lightfoot
|
|
|
|
INSP - Framing/ Rough-in | 7/3/1995 | 7/3/1995 | 7/3/1995 | | FAIL |
Dave Lightfoot
|
|
|
NOT READY
|
INSP - Gas pressure test | 7/3/1995 | 7/3/1995 | 7/3/1995 | | FAIL |
Dave Lightfoot
|
|
|
FAILED NEED 3/4" PIPE AT FURNACE
|
(F) Issue permit | | | 6/28/1995 | | PAID |
|
|
|
|
Application received | | | 6/28/1995 | | |
|
|
|
|