INSP - Final | 2/8/1996 | 2/8/1996 | 2/8/1996 | | NH |
Dave Lightfoot
|
|
|
/ / 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Final | 2/8/1996 | 2/8/1996 | 2/8/1996 | | NH |
Dave Lightfoot
|
|
|
/ / 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
(F) Issue permit | | | 7/24/1995 | | |
|
|
|
|
INSP - Final | 7/18/1995 | 7/18/1995 | 7/18/1995 | A | FAIL |
Alan Hauser
|
|
|
upper comb-air is covered with plastic needs to be removed. 25 minutes
|
INSP - Final | 7/11/1995 | | 7/11/1995 | | FAIL |
|
|
|
NO ACCESS 5MIN
|
Application received | | | 7/3/1995 | | |
|
|
|
|
INSP - Gas pressure test | 6/30/1995 | | 6/30/1995 | | PASS |
|
|
|
GAS TEST DONE BY GAS COMPANY 5MIN
|
INSP - Final | 6/30/1995 | | 6/30/1995 | | FAIL |
|
|
|
NO ACCESS - LEFT NOTICE 5MIN
|
INSP - Final | 6/30/1995 | | 6/30/1995 | | FAIL |
|
|
|
15MIN
|