INSP - Final | 9/25/1995 | 9/25/1995 | 9/25/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/25/95 337 - FNL -OK FINAL
|
INSP - Final | 9/25/1995 | 9/25/1995 | 9/25/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/25/95 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 7/19/1995 | 7/19/1995 | 7/19/1995 | | PASS |
Alan Hauser
|
|
|
R/I OK CORRECTIONS WERE MADE. 30 MIN
|
INSP - Gas pressure test | 7/19/1995 | 7/19/1995 | 7/19/1995 | | PASS |
Alan Hauser
|
|
|
GAS LEAK WAS FOUND AND FIXED BY STEVE. NEW GAS TEST PASSED. 26166 20 MIN
|
INSP - Gas pressure test | 7/18/1995 | 7/18/1995 | 7/18/1995 | A | FAIL |
Alan Hauser
|
|
|
pressure was on zero. 10 minutes
|
INSP - Framing/ Rough-in | 7/18/1995 | 7/18/1995 | 7/18/1995 | A | FAIL |
Alan Hauser
|
|
|
need to draft stop b-vent at 2nd floor and attic penatrations. electrical wire is stretched tight across b-vent on 2nd floor in wall. need to permit f/p as of07-18-95. 20 min.
|
Inspection Record Card- Mec | | | 7/17/1995 | | |
|
|
|
|
(F) Issue permit | | | 7/17/1995 | | |
|
|
|
|
Application received | | | 7/17/1995 | | |
|
|
|
|