INSP - Final | 7/25/1995 | 7/25/1995 | 7/25/1995 | P | PASS |
Alan Hauser
|
|
|
corrections made final ok 20 min
|
(F) Issue permit | | | 7/24/1995 | | |
|
|
|
|
INSP - Final | 7/21/1995 | 7/21/1995 | 7/21/1995 | A | FAIL |
Alan Hauser
|
|
|
corrections: condensate drain to go outdoors. r/a duct to be metal through garage wall into attic not flex. u.m.c. sec. 1006(a) 25 min
|
INSP - Gas pressure test | 7/20/1995 | 7/20/1995 | 7/20/1995 | P | FAIL |
Alan Hauser
|
|
|
No record
|
INSP - Gas pressure test | 7/20/1995 | 7/20/1995 | 7/20/1995 | P | PASS |
Alan Hauser
|
|
|
gas pressure ok, no access to equipment. left note #26171 20 min
|
Application received | | | 7/20/1995 | | |
|
|
|
|
INSP - Framing/ Rough-in | 7/19/1995 | 7/19/1995 | 7/19/1995 | | FAIL |
|
|
|
NOT READY 15 MIN
|