INSP - Final | 8/18/1995 | 8/18/1995 | 8/18/1995 | P | PASS |
Dave Lightfoot
|
|
|
FINAL/15 MIN
|
INSP - Final | 8/14/1995 | 8/14/1995 | 8/14/1995 | A | FAIL |
Dave Lightfoot
|
|
|
RELOCATE PROTECTION POST, NO ACCESS TO CRAWL SPACE/15 MIN
|
INSP - Gas pressure test | 7/24/1995 | 7/24/1995 | 7/24/1995 | A | PASS |
Alan Hauser
|
|
|
#26174 gas piping to furn. w/h. 15 min
|
INSP - Framing/ Rough-in | 7/24/1995 | 7/24/1995 | 7/24/1995 | A | PASS |
Alan Hauser
|
|
|
r/i ok 15 min
|
Application received | | | 7/24/1995 | | |
|
|
|
|
(F) Issue permit | | | 7/24/1995 | | |
|
|
|
|