(F) Issue permit | | | 8/20/1995 | | |
|
|
|
|
INSP - Final | 8/3/1995 | 8/4/1995 | 8/4/1995 | A | PASS |
Alan Hauser
|
|
|
corrections made on cond. drain and insulate duct. 20 min
|
INSP - Gas pressure test | 7/28/1995 | 7/28/1995 | 7/28/1995 | A | PASS |
Alan Hauser
|
|
|
#26190 gas line ok. 15 min.
|
INSP - Framing/ Rough-in | 7/28/1995 | 7/28/1995 | 7/28/1995 | A | FAIL |
Alan Hauser
|
|
|
need to: insulate s.a. plenum and transititon from furn. to a/c coil, and shorten poly tube from cond. pump outdoors. 20 min
|
Application received | | | 7/28/1995 | | |
|
|
|
|