INSP - Gas pressure test | 9/19/1995 | 9/20/1995 | 9/20/1995 | A | PART |
|
|
|
09/19/95 326 - See previoous inspection.
|
INSP - Final | 9/19/1995 | 9/20/1995 | 9/20/1995 | A | PART |
|
|
|
09/19/95 326 - Gas Test ok. Tag #27507. Corrections before Final: combustion air sources required - west end fur area.
|
INSP - Final | 9/19/1995 | 9/20/1995 | 9/20/1995 | A | PART |
|
|
|
09/19/95 326 - Gas Test ok. Tag #27507. Corrections before Final: combustion air sources required - west end fur area.
|
INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 | P | PASS |
|
|
|
08/08/95 326 - East End rough-in ok
|
INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 | | PASS |
|
|
|
|
(F) Issue permit | | | 8/4/1995 | | I |
|
|
|
|
INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 | A | PART |
Dave Lightfoot
|
|
|
PARTIAL R/I OKN WEST 1/2 OF CONSTRUCTION AREA/45 MIN
|
Inspector's copy Mec permit | | | 7/31/1995 | | |
|
|
|
|
Application received | | | 7/31/1995 | | |
|
|
|
|