INSP - Final | 9/12/1995 | 9/12/1995 | 9/12/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/12/95 337 - FNL -OK FINAL
|
INSP - Final | 9/12/1995 | 9/12/1995 | 9/12/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/12/95 337 - FNL -OK FINAL
|
(F) Issue permit | | | 8/14/1995 | | |
|
|
|
|
INSP - Gas pressure test | 8/10/1995 | 8/10/1995 | 8/10/1995 | P | PASS |
Dave Lightfoot
|
|
|
08/10/95 337 - GP -OK GAS PIPING and test ok furn w/h range log
|
INSP - Framing/ Rough-in | 8/9/1995 | 8/9/1995 | 8/9/1995 | P | PASS |
Dave Lightfoot
|
|
|
20 MIN
|
Application received | | | 8/9/1995 | | |
|
|
|
|