INSP - Final | 9/5/1995 | 9/5/1995 | 9/5/1995 | P | PASS |
Alan Hauser
|
|
|
09/05/95 350 - FNL -OK FINAL
|
INSP - Final | 9/5/1995 | 9/5/1995 | 9/5/1995 | P | PASS |
Alan Hauser
|
|
|
09/05/95 350 - FNL -OK FINAL
|
INSP - Gas pressure test | 8/10/1995 | 8/10/1995 | 8/10/1995 | P | PASS |
Alan Hauser
|
|
|
08/10/95 350 - GP -OK GAS PIPING #27978
|
INSP - Framing/ Rough-in | 8/10/1995 | 8/10/1995 | 8/10/1995 | P | PASS |
Alan Hauser
|
|
|
08/10/95 350 - RGHN-OK ROUGH IN HVAC-OK HVAC gas: furn. and w/h.
|
(F) Issue permit | | | 8/10/1995 | | |
|
|
|
|
Application received | | | 8/10/1995 | | |
|
|
|
|