INSP - Final | 9/18/1995 | 9/18/1995 | 9/18/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/18/95 337 - FNL -OK FINAL
|
INSP - Final | 9/18/1995 | 9/18/1995 | 9/18/1995 | P | PASS |
Dave Lightfoot
|
|
|
09/18/95 337 - FNL -OK FINAL
|
(F) Issue permit | | | 8/20/1995 | | |
|
|
|
|
INSP - Framing/ Rough-in | 8/10/1995 | 8/10/1995 | 8/10/1995 | P | PASS |
Dave Lightfoot
|
|
|
08/10/95 337 - R/I OK furn dryer hood 20min
|
INSP - Gas pressure test | 8/10/1995 | 8/10/1995 | 8/10/1995 | P | PASS |
Dave Lightfoot
|
|
|
08/10/95 337 - gas test ok furn fire place water heater
|
Application received | | | 8/10/1995 | | |
|
|
|
|