INSP - Final | 10/9/1995 | 10/9/1995 | 10/9/1995 | P | PASS |
Alan Hauser
|
|
|
10/09/95 350 - FINAL
|
INSP - Final | 10/9/1995 | 10/9/1995 | 10/9/1995 | P | PASS |
Alan Hauser
|
|
|
10/09/95 350 - FINAL
|
INSP - Framing/ Rough-in | 8/24/1995 | 8/24/1995 | 8/24/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 8/21/1995 | 8/22/1995 | 8/22/1995 | A | PASS |
Alan Hauser
|
|
|
08/21/95 350 - RGHN-OK ROUGH IN
|
INSP - Gas pressure test | 8/21/1995 | 8/22/1995 | 8/22/1995 | A | FAIL |
Alan Hauser
|
|
|
08/21/95 350 - pipe not finished to f/p
|
(F) Issue permit | | | 8/21/1995 | | |
|
|
|
|
(F) Reprint permit | | | 8/21/1995 | | |
|
|
|
|
Inspection Record Card- Mec | | | 8/21/1995 | | |
|
|
|
|
Application received | | | 8/21/1995 | | |
|
|
|
|