DOC - Permit Expired | 1/23/2001 | 1/23/2001 | 1/23/2001 | A | PASS |
Dave Lightfoot
|
|
|
Added by Inspector: 337 On 1/23/2001 9:46:02 AM
|
INSP - Conference | 8/12/1998 | 8/12/1998 | 8/12/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked to contractor about this job, never was final
|
INSP - Final | 8/12/1998 | 8/12/1998 | 8/12/1998 | P | PASS |
Alan Hauser
|
|
|
08/12/98 350 - final, no card to sign, talked to kim m. and wes w.
|
INSP - Final | 8/12/1998 | 8/12/1998 | 8/12/1998 | P | PASS |
Alan Hauser
|
|
|
08/12/98 350 - final, no card to sign, talked to kim m. and wes w.
|
INSP - Final | 8/31/1995 | 8/31/1995 | 8/31/1995 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 8/29/1995 | 8/29/1995 | 8/29/1995 | P | FAIL |
Alan Hauser
|
|
|
08/29/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need to finish gas pipe to rt and finish uncrating it. need to support flex pipe in attic.
|
Issue NO FEE RECEIVED permit | | | 8/29/1995 | | I |
|
|
|
|
Issue NO FEE RECEIVED permit | | | 8/29/1995 | | I |
|
|
|
|
INSP - Final | 8/25/1995 | 8/25/1995 | 8/25/1995 | P | FAIL |
Alan Hauser
|
|
|
08/25/95 350 - no final all the work was done with out a permit. double
|
INSP - Final | 8/25/1995 | 8/25/1995 | 8/25/1995 | P | FAIL |
Alan Hauser
|
|
|
08/25/95 350 - no final all the work was done with out a permit. double
|
Application received | | | 8/24/1995 | | |
|
|
|
|