INSP - Final | 11/22/1995 | 11/24/1995 | 11/24/1995 | A | PASS |
Alan Hauser
|
|
|
11/22/95 350 - REINSPECTION FINAL
|
INSP - Final | 11/22/1995 | 11/24/1995 | 11/24/1995 | A | PASS |
Alan Hauser
|
|
|
11/22/95 350 - REINSPECTION FINAL
|
INSP - Final | 11/22/1995 | 11/22/1995 | 11/22/1995 | P | NR |
Alan Hauser
|
|
|
11/22/95 350 -
|
INSP - Final | 11/22/1995 | 11/22/1995 | 11/22/1995 | P | NR |
Alan Hauser
|
|
|
11/22/95 350 -
|
(F) Issue permit | | | 9/15/1995 | | |
|
|
|
|
INSP - Gas piping | 9/7/1995 | 9/7/1995 | 9/7/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GP -OK GAS PIPING #26207
|
INSP - Framing/ Rough-in | 9/7/1995 | 9/7/1995 | 9/7/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - RGHN-OK ROUGH IN
|
Application received | | | 9/7/1995 | | |
|
|
|
|