Receive PAYMENT IN FULL | | | 8/8/1996 | | |
|
|
|
|
INSP - Final | 3/1/1996 | 3/1/1996 | 3/1/1996 | P | PASS |
|
|
|
|
INSP - Final | 3/1/1996 | 3/1/1996 | 3/1/1996 | P | PASS |
|
|
|
|
INSP - Gas log/ Fireplace | 2/27/1996 | 2/28/1996 | 2/28/1996 | A | PASS |
|
|
|
LOG LIGHTER..THEY ASKED FOR THIS INSPECTION THE SAME TIME YOU FINAL THE MECHANICAL.
|
INSP - Gas pressure test | 2/27/1996 | 2/28/1996 | 2/28/1996 | A | PASS |
|
|
|
GAS TEST
|
INSP - Final | 2/27/1996 | 2/28/1996 | 2/28/1996 | P | CANC |
|
|
|
FINAL not ready, cancel per nick
|
INSP - Final | 2/27/1996 | 2/28/1996 | 2/28/1996 | P | CANC |
|
|
|
FINAL not ready, cancel per nick
|
Issue FEE-DUE permit | | | 2/27/1996 | | FEE |
|
|
|
ADDED A LOG LIGHTER
|
INSP - Gas pressure test | 1/17/1996 | 1/17/1996 | 1/17/1996 | P | PASS |
Dave Lightfoot
|
|
|
01/17/96 337 - REINSPECTION GP -OK GAS PIPING
|
INSP - Gas pressure test | 1/12/1996 | 1/12/1996 | 1/12/1996 | P | FAIL |
Dave Lightfoot
|
|
|
01/12/96 337 - GAS TEST CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS TEST FAIL
|
Issue PAID IN FULL permit | | | 1/11/1996 | | |
|
|
|
|
INSP - Framing/ Rough-in | 1/8/1996 | 1/9/1996 | 1/9/1996 | A | PASS |
Dave Lightfoot
|
|
|
01/09/96 337 - NOT READY FOR A PRESSURE TEST RGHN-OK ROUGH IN
|
Issue & PRINT FEE-DUE permit | | | 1/9/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/9/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 1/8/1996 | | FEE |
|
|
|
|
Application received | | | 1/8/1996 | | |
|
|
|
|