INSP - Final | 6/27/1996 | 6/28/1996 | 6/28/1996 | A | PASS |
Alan Hauser
|
|
|
06/28/96 350 - CORRECTIONS MADE FINAL COULDN'T FIND A CARD TO SIGN SO LE
|
INSP - Final | 6/27/1996 | 6/28/1996 | 6/28/1996 | A | PASS |
Alan Hauser
|
|
|
06/28/96 350 - CORRECTIONS MADE FINAL COULDN'T FIND A CARD TO SIGN SO LE
|
INSP - Final | 6/24/1996 | 6/24/1996 | 6/24/1996 | P | FAIL |
Alan Hauser
|
|
|
06/24/96 350 - KEY IS ON TOP OF ELE. PANEL SIDE OF BUILDING NO FINAL NEED CORRECTIONS
|
INSP - Final | 6/24/1996 | 6/24/1996 | 6/24/1996 | P | FAIL |
Alan Hauser
|
|
|
06/24/96 350 - KEY IS ON TOP OF ELE. PANEL SIDE OF BUILDING NO FINAL NEED CORRECTIONS
|
INSP - Final | 6/21/1996 | 6/21/1996 | 6/21/1996 | | FAIL |
Alan Hauser
|
|
|
06/21/96 350 - IS THE R/I DONE THERE WAS ONLY A PARTIAL DONE R/I WAS FINISHED BUT BUILDING IS LOCKED UP FOR FINAL INSPECTION LEFT NOT
|
INSP - Final | 6/21/1996 | 6/21/1996 | 6/21/1996 | | FAIL |
Alan Hauser
|
|
|
06/21/96 350 - IS THE R/I DONE THERE WAS ONLY A PARTIAL DONE R/I WAS FINISHED BUT BUILDING IS LOCKED UP FOR FINAL INSPECTION LEFT NOT
|
INSP - Framing/ Rough-in | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - R/I OK
|
Issue PAID IN FULL permit | | | 4/17/1996 | | |
|
|
|
|
INSP - Rough-in & Gas Pressure | 2/21/1996 | 2/21/1996 | 2/21/1996 | P | PART |
Alan Hauser
|
|
|
02/21/96 350 - -BLD95-0453 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GAS PIPING OK #29863 AND #29877 TWO SEPERATE GAS LINES
|
Inspector's copy Mec permit | | | 2/21/1996 | | PASS |
|
|
|
|
Application received | | | 2/21/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 2/21/1996 | | FEE |
|
|
|
|