INSP-Final | | | 5/6/1996 | | FAIL |
|
|
|
comb.-air duct needs to be seperate all the way to the source, need a divider in duct in attic. also outside gasline not finished
|
INSP - Final | 4/30/1996 | 5/1/1996 | 5/1/1996 | P | NR |
Alan Hauser
|
|
|
not ready for final
|
INSP - Final | 4/30/1996 | 5/1/1996 | 5/1/1996 | P | NR |
Alan Hauser
|
|
|
not ready for final
|
INSP - Framing/ Rough-in | 4/5/1996 | 4/5/1996 | 4/5/1996 | P | PART |
Alan Hauser
|
|
|
04/05/96 350 - ROUGH-IN IS ONLY A PARTIAL AS STILL NEED TO SEE ALL VENTING THROUGH ROOF PRESSURE TEST ON GASPIPING.
|
Issue PAID IN FULL permit | | | 3/28/1996 | | |
|
|
|
|
Application received | | | 3/22/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 3/22/1996 | | FEE |
|
|
|
|