INSP - Final | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | PASS |
Alan Hauser
|
|
|
06/25/96 350 - UNIT 1006 final ok
|
INSP - Final | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | PASS |
Alan Hauser
|
|
|
06/25/96 350 - UNIT 1006 final ok
|
Issue PAID IN FULL permit | | | 6/18/1996 | | |
|
|
|
|
FEE REVIEW-NOTES | | | 6/18/1996 | | TRAN |
|
|
|
this was a dup. permit. transf. money from mec96-0800
|
INSP - Gas pressure test | 4/4/1996 | 4/4/1996 | 4/4/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GAS PIPING OK TO GAS FIREPLACE #29329 FINAL
|
INSP - Framing/ Rough-in | 4/4/1996 | 4/4/1996 | 4/4/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ROUGH-IN IS OK
|
INSP - Gas pressure test | 4/4/1996 | 4/4/1996 | 4/4/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - GAS PIPING OK TO GAS FIREPLACE #29329 FINAL
|
INSP - Framing/ Rough-in | 4/4/1996 | 4/4/1996 | 4/4/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ROUGH-IN IS OK
|
INSP - Rough-in & Gas Pressure | 4/3/1996 | 4/3/1996 | 4/3/1996 | P | FAIL |
Alan Hauser
|
|
|
04/03/96 350 - ROOM 1006 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NEED PRESSURE RELIEF VALVE IN GASLINE TO REDUCE DOWN FROM 2# SYSTEM. TALKED WITH JEFF AT WESTERN ABOU CONFERENCE
|
Application received | | | 4/3/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 4/3/1996 | | FEE |
|
|
|
|