INSP - Final | 7/1/1996 | 7/1/1996 | 7/1/1996 | P | PASS |
|
|
|
07/01/96 326 - REINSPECTION Correction made. Final ok.
|
INSP - Final | 7/1/1996 | 7/1/1996 | 7/1/1996 | P | PASS |
|
|
|
07/01/96 326 - REINSPECTION Correction made. Final ok.
|
INSP - Final | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | NR |
|
|
|
06/25/96 326 - Correction req'd. - Protection postt.
|
INSP - Final | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | NR |
|
|
|
06/25/96 326 - Correction req'd. - Protection postt.
|
INSP - Final | 6/21/1996 | 6/24/1996 | 6/24/1996 | A | NH |
|
|
|
06/24/96 326 - No access - attached sticker.
|
INSP - Final | 6/21/1996 | 6/24/1996 | 6/24/1996 | A | NH |
|
|
|
06/24/96 326 - No access - attached sticker.
|
INSP - Final | 6/18/1996 | 6/19/1996 | 6/19/1996 | P | CANC |
Dave Lightfoot
|
|
|
06/19/96 337 - AFTER 2PM PLEASE. called and cancel
|
INSP - Final | 6/18/1996 | 6/19/1996 | 6/19/1996 | P | CANC |
Dave Lightfoot
|
|
|
06/19/96 337 - AFTER 2PM PLEASE. called and cancel
|
INSP - Framing/ Rough-in | 6/14/1996 | 6/17/1996 | 6/17/1996 | A | PASS |
|
|
|
06/17/96 326 - REINSPECTION Correction made. FP terminatin requires only 6"clearance to sidewall. R/I ok.
|
Issue PAID IN FULL permit | | | 5/7/1996 | | |
|
|
|
|
INSP - Rough-in & Gas Pressure | 4/29/1996 | 4/30/1996 | 4/30/1996 | A | PART |
|
|
|
04/30/96 326 - W/ A F/P Gas Tesdt ok - Tag #28339. Ductwork R/I ok. Upstairs FP cannot be vented wall - correction req'd.
|
Application received | | | 4/29/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 4/29/1996 | | FEE |
|
|
|
|