INSP - Final | 8/27/1996 | 8/27/1996 | 8/27/1996 | P | PASS |
|
|
|
08/27/96 338 - please call jayme 1/2 hour before going out ###-#### he w there. (they live were the fire is. ) made okthe gas pressure test onl 25 # I let pressure down below same
|
INSP - Final | 8/27/1996 | 8/27/1996 | 8/27/1996 | P | PASS |
|
|
|
08/27/96 338 - please call jayme 1/2 hour before going out ###-#### he w there. (they live were the fire is. ) made okthe gas pressure test onl 25 # I let pressure down below same
|
INSP - Final | 8/27/1996 | 8/27/1996 | 8/27/1996 | | PART |
Alan Hauser
|
|
|
/ / 350 - APPROVED GAS PIPE SIGNED TEMP. CARD NEED TO LOOK AT GAS EQUI UP
|
INSP - Final | 8/27/1996 | 8/27/1996 | 8/27/1996 | | PART |
Alan Hauser
|
|
|
/ / 350 - APPROVED GAS PIPE SIGNED TEMP. CARD NEED TO LOOK AT GAS EQUI UP
|
INSP - Partial final | 8/21/1996 | 8/21/1996 | 8/22/1996 | P | FAIL |
Alan Hauser
|
|
|
08/21/96 350 - FINAL ON MECHANICAL ONLY (NO GAS PRESSURE TEST) SHE NEEDS could not find a address for this job
|
INSP - Gas pressure test | 8/19/1996 | 8/20/1996 | 8/20/1996 | A | FAIL |
|
|
|
08/20/96 326 - REINSPECTION Gas Test FAILED. Wrote note: Complete all gas piping before calling for reinspection.
|
INSP - Final | 8/19/1996 | 8/19/1996 | 8/19/1996 | P | NR |
|
|
|
08/19/96 326 - Not ready.
|
INSP - Gas pressure test | 8/19/1996 | 8/19/1996 | 8/19/1996 | P | FAIL |
|
|
|
08/19/96 326 - Gas Test FAILED.
|
INSP - Final | 8/19/1996 | 8/19/1996 | 8/19/1996 | P | NR |
|
|
|
08/19/96 326 - Not ready.
|
INSP - Gas pressure test | 5/16/1996 | 5/16/1996 | 5/16/1996 | P | FAIL |
|
|
|
05/16/96 326 - Gas Test FAILED.
|
INSP - Framing/ Rough-in | 5/16/1996 | 5/16/1996 | 5/16/1996 | P | PASS |
|
|
|
05/16/96 326 - Duct R/I ok.
|
Application received | | | 5/10/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/10/1996 | | |
|
|
|
|